Loading…
Price on Application
Request pricing details

Existing building with industrial characteristics suitable for repurposing
This listing has not been placed on the map yet, so site areas cannot be drawn.
Scored using engine v1 · 10/19/2026
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
Notus Industrial comprises approximately 160 acres of rail-served industrial land with Highway 20/26 frontage in Caldwell, Idaho. The site is currently in the design phase, allowing end users to influence site planning and customize layouts. Future building pads range from approximately 45,000 square feet to 485,000 square feet, supported by direct Union Pacific rail access and planned controlled crossings with new frontage roads on both sides of the tracks. Located in Canyon County, one of Idaho's fastest-growing industrial and population centers, the property offers strategic connectivity and scalability. Highway frontage carries an average of 7,300 vehicles daily, with traffic projected to increase 170% over the next fifteen years. The combination of substantial acreage, flexible pad configurations, rail logistics, and proximity to expanding infrastructure positions this site for large-scale industrial or mission-critical development.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.