Loading…
Price on Application
Request pricing details
Land/development site for greenfield infrastructure build-out
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
This 230-acre processing facility in Brawley sits within the South Brawley Known Geothermal Area near the Salton Sea, offering significant energy infrastructure and water access. The site includes an onsite rail spur connected to Union Pacific, a 1 MW solar microgrid, and a 9.4 MW steam turbine. Water supply is secured through a 2025 apportionment of 1,854.2 acre-feet from the Imperial Irrigation District. The property's proximity to geothermal resources and established utility connections positions it for potential redevelopment as critical digital infrastructure in a region with expanding renewable energy capacity.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.