Loading…
$25.00M

Title or description contains data center indicators
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 10/20/2026
Nearest Substation
UNKNOWN13833
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
Chandler Park Industrial Campus spans three buildings totaling 765,000 square feet in Cleveland, anchored by a 595,000-square-foot heavy-power facility at 17325 Euclid Avenue with freight elevators, multiple loading positions, and substantial vacant space ready for redevelopment or lease-up. The campus includes a 110,000-square-foot multi-tenant industrial flex property at 1700 London Road and a fully leased 60,000-square-foot building at 1800 London Road generating stable cash flow. Portions of the main building previously operated as data center space, and the site retains heavy-power infrastructure suited for high-density industrial or digital infrastructure applications. Located within 2.5 miles of I-90 and near an active Norfolk Southern Railway line, the campus offers below-replacement-cost basis with diversified tenancy, existing income, and multiple paths for value creation. The combination of excess vacancy, robust electrical capacity, and proximity to major logistics corridors positions Chandler Park for conversion, lease-up, or repositioning as mission-critical infrastructure.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.