Loading…
Price on Application
Request pricing details

24.35 acre site with no existing structure — suitable for ground-up development
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 11/6/2026
Nearest Substation
ROOT RIVER
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
Franklin Corporate Park Phase II offers a greenfield development opportunity in Franklin, Wisconsin, positioned 0.9 miles from the I-94 Elm Road interchange. The site accommodates up to 300,000 square feet with mass grading complete and municipal water and sewer infrastructure in place. Power is available at 3,000 amps, 480/277v three-phase, with AT&T and Spectrum providing connectivity options. The property supports flexible building configurations and build-to-suit arrangements. ESFR sprinkler systems and LED lighting are planned, with projected operating expenses of $1.80 per square foot. Loading dock specifications can be tailored to tenant requirements, making this a customizable platform for data center or mission-critical infrastructure deployment in the greater Milwaukee market.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.