Loading…
Price on Application
Request pricing details
Title or description contains data center indicators
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 11/12/2026
Nearest Substation
UNKNOWN30550
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
This 30.275-acre industrial site in north Abilene sits directly adjacent to an AEP Texas 69 kV substation, offering immediate proximity to established electrical infrastructure. Approximately 25 acres are usable for development, with existing underground water storage tanks that may support cooling or operational water needs. The property is located within an established industrial corridor near US Highway 83, providing convenient access for construction and ongoing operations. A completed RCRA Facility Investigation found no contamination on this former Pride Refining site, removing a significant environmental risk factor for redevelopment. The combination of substation adjacency, clean environmental status, existing water infrastructure, and available acreage positions the site for evaluation as a modular data center facility, edge computing deployment, or other power-intensive industrial application. Grid interconnection capacity, utility service availability, and permitting requirements are subject to buyer verification and applicable regulatory approvals.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.