Loading…
Price on Application
Request pricing details
Title or description contains data center indicators
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 11/24/2026
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
LUMINA at Cruce Lo Pinto is a 68,380 m² industrial parcel positioned at the northeast quadrant of the Ruta 5 Norte / Lo Pinto interchange in Colina, in the core of Santiago's established data center corridor. The site sits within 7–10 km of EdgeConneX Colina, Microsoft's Chile cloud region, Google Quilicura, and Cirion, with direct proximity to the 2x110 kV Cerro Navia–Las Vegas transmission line and S/E Batuco approximately 0.8 km away. Grid connection authorization was issued by the Coordinador Eléctrico Nacional in October 2026 for a 27 MW / 108 MWh battery under NUP 7097 (S/E Batuco 23 kV), with expansion capacity approved to 50 MW / 200 MWh within the same authorization. Separate environmental rulings from December 2024 and December 2025 confirm that no environmental impact assessment is required for either the battery or the planned data center use. The parcel is zoned Industrial Exclusive Zone N°1 under the September 2025 PRC Colina, permitting energy infrastructure and industrial applications, and holds MOP road access feasibility at Ruta G-155. Chile's data center demand is projected to grow from 325 MW in 2025 to 1,207 MW by 2030. With grid studies, connection approval, and access feasibility complete, LUMINA offers a development-ready campus site where the buyer determines phasing and secures the dedicated data center supply connection. The property is being offered through an unpriced call for offers, with initial submissions due February 12, 2027, followed by a best-and-final round for shortlisted parties.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.