Loading…
$7.73M
Existing building with industrial characteristics suitable for repurposing
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 11/29/2026
Nearest Substation
UNKNOWN31475
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
This 90.89-acre tract sits one mile west of Texas Instruments' $30 billion semiconductor expansion in southern Sherman, positioned at the intersection of Shepherd Road and Farmington Road. The site benefits from immediate proximity to the region's accelerating chip manufacturing buildout, anchored by TI and Global Wafers, with infrastructure investments already underway to support the population and employment growth radiating from the DFW corridor. A 20-inch groundwater line runs along Farmington Road, and a 36-inch sewer main is located approximately one mile east at the TI campus. Shepherd Road has been upgraded to four lanes with a center median in anticipation of continued commercial development. Nearby projects include HEB's 20-acre site, Centurion American's Cottonwood development on FM 902, and the Shepherd's Place master-planned community at Shepherd Road and Highway 75. The property lies within Sherman city limits, offering flexible zoning and connectivity to both regional infrastructure and the talent pool serving the expanding semiconductor corridor. Owner financing is available.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.