Loading…
Price on Application
Request pricing details

Existing building with industrial characteristics suitable for repurposing
This listing has not been placed on the map yet, so site areas cannot be drawn.
Scored using engine v1 · 10/19/2026
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
4500 CR 317 delivers a shovel-ready industrial site with front-end development already complete, including Phase 1 ESA, grading and drainage plans, survey, and Texas PE-stamped plans for a crane-capable metal building package. The property sits at the concrete terminus of CR 317 in Alvarado, positioned on the US 67 corridor approximately five miles from Cleburne and seven miles from I-35W, adjacent to an active multi-tenant industrial facility and available expansion acreage owned by the Keene Economic Development Corporation. The engineered building package specifies a 10-ton freespan crane with 79-foot span at 18.5-foot rail elevation and expandable endwall framing, reducing predevelopment risk and accelerating path to occupancy. Capital deployment is underway in the corridor, with Amazon's 1.7 million square foot Cleburne facility operational and Metalplate Galvanizing's new Keene plant under construction as of May 2026, while the City actively recruits advanced manufacturers to the industrial park. Johnson County recorded approximately 21 percent population growth from 2020 to 2025, supporting sustained demand for industrial infrastructure along this developing logistics and manufacturing corridor between Fort Worth and Waco.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.