Loading…
Price on Application
Request pricing details
Title or description contains data center indicators
Zoom in and outline the part of the site you care about — a pad, the buildable acreage, a laydown yard. Saved areas carry acreage and perimeter, and can be handed to the Site Viability Report so the analysis is about that ground, not the whole parcel. Imagery outlines are screening inputs, not a survey.
Scored using engine v1 · 10/19/2026
Fiber Connectivity
No fiber providers documented for this listing yet.
Infrastructure scores blend nearest-substation distance, voltage, dual-feed status, and known fiber providers. Distances are computed via haversine on HIFLD substation coordinates.
This 13-acre industrial-zoned site in Auburndale sits directly adjacent to the Osprey Energy Center and Osprey 230kV Substation, with multiple 230kV transmission lines serving the node. A preliminary service letter supports 40 MW total facility load—10 MW available by December 2028 and the full 40 MW by December 2029, subject to system study and definitive customer service agreement. Industrial rezoning is approved, and the parcel lies outside FEMA flood zones. Auburndale's position between Tampa and Orlando along the I-4/US-92 corridor delivers on-net carrier access, route diversity, and low latency to both metros. The inland Polk County location reduces direct coastal storm-surge exposure, though flood mitigation, drainage, windload, and insurance merit standard buyer diligence. The combination of adjacent generation infrastructure, approved zoning, scalable power capacity, and fiber-corridor connectivity positions the site for mid-scale AI and HPC deployments, advanced manufacturing, or battery-storage applications requiring both robust utility service and metro-market proximity.
External listing — imported from crexi. InfraSale does not represent this listing directly. Request full details and due diligence through InfraSale.